Daughalands Local Railway: Difference between revisions
No edit summary |
No edit summary |
||
| Line 49: | Line 49: | ||
== Routes == | == Routes == | ||
As of | As of Faey 20,751, Daughalands Local Railway regular weekday routes are as follows: | ||
{| class="wikitable" style="width:550px;" | {| class="wikitable" style="width:550px;" | ||
|+ style="font-weight:bold;" | Route A – ''Vehtle - Davelo'' | |+ style="font-weight:bold;" | Route A – ''Vehtle - Davelo'' | ||
! style="width:35%;" | Route | ! style="width:35%;" | Route | ||
! style="width:55%;" | Calling at | ! style="width:55%;" | Calling at | ||
|- | |- | ||
| Line 73: | Line 67: | ||
|+ style="font-weight:bold;" | Route B – ''Your Route Name Here'' | |+ style="font-weight:bold;" | Route B – ''Your Route Name Here'' | ||
! style="width:35%;" | Route | ! style="width:35%;" | Route | ||
! style="width:55%;" | Calling at | ! style="width:55%;" | Calling at | ||
|- | |- | ||
Revision as of 00:56, 15 June 2025
Overview
| Main region(s) | The Daughalands Davalays |
| Other region(s) | Central Dave Town |
| Fleet | DT Class 450 DT Class 451 |
| Parent company | New Dave Corporation Gum Corporation |
| Reporting mark | DL |
| Dates of Operation | 24 Darche 20,751- Present |
Route Map
Greater Daughalands Railway Company, trading as Daughalands Local Railway (DLR) is a Train Operating Company in Dave Town, owned by NDC Group (80%) and GumCorporation (20%)
History
Daughalands Local Railway was established in 20,740, with the aim of re-opening 4 unused stations on the DNC Altitude Line, along with rebuilding an unused section of the line. There initial track access agreement was granted by the Minister for Transport, the Lt. Hon Darley Vankham in 20,741, with the proposed first operations date to take place in Gosruary 20,750. However, station preparations took longer than planned, and services began over a year later on the 23rd of Darche, 20,751.
Daughalands Local Railway was awarded with a fleet of 34 Class 450 DMU's, all having been previous DNC Stock. In 20,742, these unit's were refurbished and overhauled with air conditioning and first class seating. Between 20,743 and 44, 5 class 451 units were added to the company's fleet.
The company managed to re-open the first 2 station's, Divcall and Davann Farm on time, but due to rail worker strikes in 20,745, work on the section of track between the Davernne Bridge Junction and Vacety was severely delayed. The other 2 stations, Davernne Docks and Vacety, were eventually opened in late 20,750.
Testing with Dave Rail Regulation trains began a week after the track was completed, with 450's first making use of the new track a month after. Testing continued until Gosruary 20,751, and the line was eventually opened for the public on Darche 23rd.
Services
Routes
As of Faey 20,751, Daughalands Local Railway regular weekday routes are as follows:
| Route | Calling at | |
|---|---|---|
| Vehtle to Davelo |
|
| Route | Calling at | |
|---|---|---|
| [Route name] | [Station 1], [Station 2], [Station 3] |